Arc-Tech MU supported Main Contractor CCG (Scotland) by providing a full design, supply and installation of multi-utilities including:
Gas:
- Design approval for new Gas mains and services design
- Liaise with GT and adopting IGT and carry out gas connection onto existing main
- Supply and installation of 867m of 125/90/63mm Gas mains pipework from a connection location
- Supply and installation of 71No 32mm single gas services
- Supply and installation of 239No gas services via external screwed steel gas riser
- Excavate, backfill and reinstate joint bay for Gas CSEP as well as 10m of offsite track to bring new gas mains into the site boundary
Electricity:
- Design approval for new Electric mains and services design
- Liaise with DNO and adopting IDNO and carry out electric connection onto existing main
- Supply and installation of 980m of LV mains cabling from new substation
- Supply and installation of 71No single electric services for the 71No houses
- Supply and installation of 13No Distribution boards and 239No internal electric services to serve flatted properties
- Excavate, backfill and reinstate joint bay for Electric POC to bring the new electric mains to the site boundary
Water:
- Liaise with Scottish Water and carry out mains connection onto existing SW main
- Supply and installation of 845m 125/90/63mm Barrier pipework and associated fittings
- Supply and installation of 71No 25mm Barrier pipe services
- Supply and installation of 14No 90/63mm Barrier pipe service to serve the flatted properties
- Excavate, backfill and reinstate joint bay for Water POC to bring new water mains into the site boundary