West Lothian Council, Livingston
Arc-Tech MU has helped to support two, Council-led, new build developments in Livingston that have delivered a combined 58 affordable homes.
Located at Deans South and Eagle Brae, both projects were led by CCG (Scotland) on a full design & build basis with both sites undertaking dramatic change; Deans South was formerly a large storage facility whilst Eagle Brae was once home to post-war housing stock, both of which were in a state of disrepair prior to construction.
Each site is now home to high-quality, highly energy-efficient homes managed by the Council for social rent that have both responded to local tenancy demand with between 2-4 bedrooms provided alongside specially-designed homes for the elderly and wheelchair users.
Arc-Tech MU was responsible for the installation of multi-utilities for the projects with each contract’s package comprising of:
Gas
- Design approval for new Gas mains and services design
- Liaise with GT and adopting IGT and carry out gas connection onto existing main
- Supply and installation of between 270m and 386m of 90/63mm Gas mains pipework
- Supply and Installation of 25m of 250mm PE and 15m of 125mm PE pipework for required SGN diversion works (Deans South only)
- Supply and installation of 29No Single Gas Services
- Excavate, backfill and reinstate joint bay for Gas CSEP as well as offsite track to bring new gas mains into the site boundary
Electrical
- Design approval for new Electric mains and services design
- Liaise with DNO and adopting IDNO and carry out electric connection onto existing main
- Supply and installation of 2No new HV mains cables from POC to new substation
- Between 305m and 465m of LV mains cabling installed throughout site
- Supply and installation of 1No 500kVa packaged substation and GRP enclosure (Eagle Brae only)
- Supply and installation of 29No single electric services for the 29No houses
- Excavate, backfill and reinstate joint bay for Electric POC as well as offsite track to bring the new electric mains to the site boundary
Water
- Liaise with Scottish Water and carry out mains connection onto existing SW main
- Supply and installation of between 292m and 370m of 90/63mm HPPE/MDPE pipework and associated fittings
- Supply and installation of 29No 25mm MDPE services
- Plots 26-29 connected to existing SW mains (Deans South only)
- Excavate, backfill and reinstate joint bay for Water POC as well as offsite track to bring new water mains into the site boundary
Deans South was fully handed over to the client in late-2022 whilst Eagle Brae is set for completion in early-2023.
Client:
West Lothian Council